Brief: Discover the MM-Tech Mazinger 355i Hydraulic Butt Fusion Welding Machine, designed for HDPE pipes up to 355mm. Ideal for mining applications, this trailer-mounted welder features advanced automation, precision engineering, and compliance with ISO21307 and ASTM F2620 standards. Watch how it heats and butts HDPE pipes with ease.
Related Product Features:
Complies with ISO21307 and ASTM F2620 High-force standards for reliable welding.
Fully automated system powered by SIEMENS PLC technology for precision.
Constructed from premium aluminum for durability and accuracy.
Dual-axis frame ensures even distribution of welding force.
On-board heating plate with protection frame and insulated shield.
Hydraulic-powered high-capacity trimmer for efficient pipe preparation.
Removable chassis and trimmer for versatile in-ditch and short spigot welding.
Data logger compatible with PEWELDBANK and USB port for firmware upgrades.
Вопросы:
What is the warranty period for the MM-TECH HDPE Fusion Machine?
All MM-TECH machines come with a 2-year warranty from the date of dispatch. For details, consult the MM-TECH WARRANTY CERTIFICATE.
What standards apply to thermoplastic pipe welding?
Welding standards include DVS2207-1-2016 (Germany), ISO21307-2017 (International), and ASTM F2620-19 & F714-13 (USA).
How do I select the right equipment for my project?
MM-TECH offers machines for pipes up to 3000mm O.D. The model number indicates the maximum pipe size. Consult MM-TECH sales for specific needs.
How long does it take to make a fusion joint?
Time depends on welding norms, pipe material, diameter, wall thickness, and operator experience.
Can jointed pipes be laid down immediately after welding?
No. Pipes must remain in the machine (with/without pressure) until cooling time ends, as per welding norms.